The mast all 70 feet of it at the Svendsons mast dock.
|
|
|
|
|
I have to paint all of that!!!! Better get some friends.
|
|
|
|
|
Friends show up and paint! Great Friends!!!
|
|
|
|
|
No not a body, Linda under the keel painting.
|
|
|
|
|
Melissa helping to get the rudder back on.
|
|
|
|
|
Noel Amherd, reattaching the rudder bolts.
|
|
|
|
|
Noel painting Aiki's Eyes.
|
|
|
|
|
Asian boats all have eyes to help them avoid underwater hazards. We figured Aiki needed some.
|
|
|
|
|
Noel outdid himself! What a shame that only the fish can see them!
|
|
|
|
|
Melissa looks over the B crews work on the rudder. Much straighter, and even
hydrodynamic! Used the foil sections from Bruce King (Thanks Bruce!).
|
|
|
|
|
Donny riding on the travel lift reading the sign that says no one is supposed
to ride on the boat while in the travel lift.
|
|
|
|
|
Aiki afloat at the work berth at Grand Marina
|
|
|
|
|
Removal of the interior furniture in the main salon to get better access for retabbing the ring frames and the bulkheads
|
|
|
|
|
Removing the ceilings (The wood on the hull) meant removing a lot of bungs! #$%^&^&^
|
|
|
|
|
BOB the GREAT! Shows up and welds all the ring frames! Most of them were cracked because the original welds were 1/16th of an inch penetration or less. Now we have 80% penetration and sisters on each!
|
|
|
|
|
That is a lot stronger ring frame!
|
|
|
|
|
Guy is much happier now that things are starting to go back together!
|
|
|
|
|
Guy removes the rest of the old tabbing by grinding it out for 5 days, and then M and Guy retabb all the ring frames and the bulkheads.
|
|
|
|
|
Guy and The bulkheads being retabbed
|
|
|